Jiangsu Zhonghong Photovoltaic Engineering Technology Co., Ltd. 200MW Photovoltaic Power Station Project Phase I Construction Tender Notice

Jiangsu Zhonghong Photovoltaic Engineering Technology Co., Ltd. 200MW Photovoltaic Power Station Project Phase I Construction Tender Notice

I. Project Overview

1. Project name: Bidding for 200MW photovoltaic power station project of Jiangsu Zhonghong Photovoltaic Engineering Technology Co., Ltd. (Guizhou Pu'an 50MW, Tibet Dangxiong 60MW, Guangxi Qinzhou 60MW, Jilin Shuangliao 45MW):
Phase I: Bidding for construction of Guizhou Pu'an 50MWp photovoltaic project,
The first bid section: civil engineering construction;
The second bid section: electromechanical installation and construction;
The third bid section: electrical installation construction;
2. Project location: Pu'an County, Guizhou.
3, the contents of the tender:
Tender No. Name Bid Opening Time Remarks
JSZH-TJGC Civil Engineering October 26, 2016
(Beijing time 9:15 on Wednesday)
JSZH-JDGC Mechanical and Electrical Installation October 26, 2016
(Beijing time 13:15 on Wednesday)
JSZH-DQGC Electrical Installation October 27, 2016
(Thursday 9:15, Beijing time)
4, source of funds: the owner
5. Qualification Examination: Postqualification
6. Construction period: based on the contract time
Second, the bidder requirements
1. The bidder must be an independent legal person registered in the territory of the People's Republic of China (excluding Hong Kong, Macao, and Taiwan) with a registered capital of RMB 10 million (or equivalent in foreign currency) and qualified as a VAT general taxpayer. Being ordered to close down, bids cancelled, or assets taken over, frozen, and bankrupted;
2. Has the necessary professional skills, qualifications, and good after-sales service capabilities to fulfill the contract, and has the ability to implement projects across regions;
3. The bank credit record is good, the financial status is good, and there is enough liquidity to undertake the implementation of the tender content;
4. Has good business reputation and performance, has no performance of bad records of the contract, no bad litigation records, no records of violations in the tendering and bidding activities;
5. The bidder must have the relevant qualifications for professional contracting at level 3 and above, and the electrician must have qualifications for general contracting and qualifications for the third-level and above. The total construction performance of the bidder for the past three years is not less than 200MW, and the performance of a single project is not less than 20MW.
6. The bidder has no bad operating records in the construction of domestic photovoltaic power station construction projects with a scale of more than 20 MWp, no bad after-sales service records, and no technical or business records that the owners consider irresponsible;
7, through the ISO9000 series quality system certification, and within the validity period, and has a sound quality management system;
8, the tender does not accept the agent bid.
9. The Commonwealth does not accept bids from the Consortium.
10. Subcontracting is not allowed in this tender.
2. Time for purchase of tender documents: From October 14th, 2016, the deadline for submission of bids will be before 17:00 Beijing time on October 25th, 2016, from 09:00 to 17:00 daily except holidays.